First fix is cable routes, back boxes, and consumer unit installation, all carried out before plaster goes on the walls. Once that stage is done, moving a socket or adding a circuit gets a lot more disruptive and expensive.
The decisions worth making early are socket and switch positions in every room, whether you want an EV charger circuit fitted now even if the car comes later, and whether the consumer unit has spare capacity for anything you might add down the line, like outdoor lighting or a home office circuit.
We work alongside builders and project managers and fit around the wider build schedule, so first and second fix happen at the right point without holding up other trades.
Second fix, sockets, switches, and final connections, happens once plaster and flooring are down. Call 087 187 0353 to talk through your build early, before first fix starts.